1103 S. Maple Street Bristol, Indiana 46507 574-848-5593 / Fax 574-848-5472
Previous Step
Back to Gallery
Next Step
Moving Into Position
The first half is slowly lowered onto the foundation. It takes a lot of coordination between the set crew and the crane operator to make sure the home is placed properly.